Wednesday, October 21, 2026
News

Haridwar: 20-day Ganga canal closure impacting pilgrims ahead of Kumbh Mela

SocialTwist Tell-a-Friend    Print this Page   COMMENT

Haridwar (Uttarakhand) | October 21, 2026 10:11:15 IST
The Upper Ganga Canal, stretching from Haridwar to Kanpur, has been closed for a 20-day annual shutdown to undergo routine desilting, structural repairs, and fast-tracked infrastructure preparations ahead of the upcoming Kumbh Mela, officials announced.

The temporary closure, managed by the Uttar Pradesh Irrigation Department, has resulted in a sharp drop in water levels across several prominent ghats in Haridwar, including Har Ki Pauri. The depleted flow has caused inconvenience to thousands of visiting pilgrims, leaving many unable to take traditional holy dips.

Executive Engineer of the Uttar Pradesh Irrigation Department, Vikas Tyagi, confirmed the ongoing exercise and assured that arrangements had been made for visiting pilgrims.

Despite the release of water, many arriving devotees expressed disappointment over the diminished flow, with several resorting to using mugs and small vessels (lotas) to bathe along the steps of the ghats. However, pilgrims shared mixed feelings as they adjusted their religious rituals to the situation.

Sanjay, a visiting devotee, noted that while taking a proper dip was challenging, visiting the holy site remained a spiritual experience.

"We were very happy to have darshan of Mother Ganga, though the lack of water made taking a dip difficult. We were unaware of the closure beforehand; residents informed us that water supply would fully resume around Dhanteras. Although we couldn't take a proper dip, we bathed using water containers and felt blessed to be here," Sanjay said.

Similarly, Garima, who travelled to Haridwar for her child's head-shaving (mundan) ceremony, shared her experience navigating the lower water levels.

"When we first saw that the main flow was closed, we felt a bit disappointed as it was our first visit. However, I managed to sit in the water and perform the ritual comfortably. We completed the ceremonies smoothly, and despite the lower water level, we feel deeply fulfilled," she said.

Officials maintained that routine desilting, maintenance of embankments, and channel repair works will be carried out on priority throughout the pre-Diwali maintenance period. Normal water discharge across the canal network is scheduled to be fully restored at the end of the 20-day maintenance drive. (ANI)

 
  LATEST COMMENTS ()
POST YOUR COMMENT
Comments Not Available
 
POST YOUR COMMENT
 
 
TRENDING TOPICS
 
 
CITY NEWS
MORE CITIES
 
 
INDIA WORLD ASIA
'Art is mirror of culture': President Mu...
Delhi Police bust inter-state car theft ...
SC directs Andhra poll panel to consider...
'Leaders like Rahul Gandhi suffer from '...
'Do you have guts to do same to BJP lead...
Tripura CM Manik Saha pays tribute to po...
More...    
 
 Top Stories
Pakistan’s hostile healthcare envir... 
IPL 2027: Delhi Capitals ropes in A... 
Apparel Group Accelerates India Ret... 
From technology to real estate: Bui... 
Asian Para Games: Dilip, Basil's me... 
Noel Clarke pleads not guilty to si... 
India’s Solar Energy Sector Enters ... 
3R ZeroWaste Reports Consistent 15–...