Wednesday, August 12, 2026
News

"Bengaluru deserves infrastructure guided by scientific planning": BJP's Tejaswi Surya seeks review of Hebbal tunnel project

SocialTwist Tell-a-Friend    Print this Page   COMMENT

Bengaluru (Karnataka) | August 12, 2026 5:58:37 PM IST
BJP MP Tejaswi Surya has sought an independent technical review of the Hebbal Short Tunnel Project, flagging concerns over its design, safety, use of Hebbal Lake land and integration with Bengaluru's future public transport network.

In a letter to Karnataka Chief Minister DK Shivakumar, Surya said the 2.2-km project connecting Hebbal Junction with the Karnataka Veterinary, Animal and Fisheries Sciences University (KVAFSU) is estimated to cost Rs 1,139 crore and has commenced.

Surya said the proposed tunnel passes through lake land, with 3.45 acres of Hebbal Lake transferred for the project. He also claimed that the project was notified without the approval of the Bengaluru Metropolitan Land Transport Authority (BMLTA), despite representations and objections from citizens.

Raising concerns over the project's design, Surya said it could have "serious safety and operational" issues, including unsafe curves at the tunnel entry and exit, inadequate merge lengths, infringement of the lake buffer zone, possible ramp tailbacks and prolonged traffic disruption on Hebbal Road during construction.

He also said the proposal appears to conflict with the proposed Red Line (Phase 3A) Metro corridor and Suburban Rail alignment.

"Reports also indicate that the proposed Veterinary College Metro Station has been dropped, adversely affecting future public transport integration," Surya said in his letter.

He said these issues point to a lack of integrated, long-term transport planning for Bengaluru.

Surya has requested the Chief Minister to order a comprehensive traffic simulation and an independent technical assessment by the IISc Sustainable Transportation Lab (IST Lab) before any further execution of the project.

He has also sought the views of the Directorate of Urban Land Transport (DULT) and BMLTA before the project proceeds further.

"In the larger interest of Bengaluru and in view of the concerns raised by citizens, I urge your intervention to ensure that the project undergoes an independent technical review before any further execution," Surya said in the letter to the CM Shivakumar.

The BJP MP also urged the Karnataka government to institutionalise a Standard Operating Procedure (SOP) for all major urban transport projects in the state, mandating independent technical evaluation, integrated multimodal planning and consultation with relevant statutory agencies before project approval. (ANI)

 
  LATEST COMMENTS ()
POST YOUR COMMENT
Comments Not Available
 
POST YOUR COMMENT
 
 
TRENDING TOPICS
 
 
CITY NEWS
MORE CITIES
 
 
INDIA WORLD ASIA
'Govt has no answers': Akhilesh Yadav de...
IndiGo flight from Kolkata lands safely ...
Tamil Nadu Assembly passes resolution ag...
Mumbai: 6 dead, 4 injured in Kurla lands...
'Government does not feel responsible to...
'NDMC little misguided that there is mas...
More...    
 
 Top Stories
"Heavy is the head which wears the ... 
NBA team Los Angeles Lakers set for... 
Steven Spielberg to be honoured at ... 
Iran knew Trump's exact Ankara loca... 
India, Germany conclude development... 
Karnataka HC upholds police power t... 
FCRA amendment bill sent to JPC, Go... 
IPL: Punjab Kings started off-seaso...