Home Site Map Make Your Home Page Suggestions Enquiry Advertise With Us
Friday, February 10, 2012  
 
 
News Home
Video News
Press Releases
Features
Events
Special Articles
   
  News Updated on Friday, February 10, 2012 5:26:03 PM
   Find Us on Facebook    Follow Us
» India » Asia » World » Sports » Business » Sci-Tec » Health » Entertainment » Bollywood » Picture Gallery
 
 India

Restoration works going in full swing
Chennai | Wednesday, Nov 18 2009 IST
 

 

 

Restoration works on the Nilgiris Mountain Railways, which was extensively damaged due to landslips triggerred by heavy rains, was going in full swing.

A press release from the Salem Division of the Southern Railway said due to heavy rains extensive damage was caused to NMR by way of landslips and breaches. The restoration work has been taken up in full swing on the 38 km stretch from Kallar to Ooty. More than 250 railway staff and contractual labourers with machineries were engaged in the restoration work. Earth moving machines, four Poclain machines and two JCB machines were also engaged in restoration work. Work is also going on in a place where a breach of about 35 metres in length occurred near Aravankadu railway station. One Divisional Engineer, two Assistant Divisional Engineers, and one Assistant Divisional Mechanical Engineer have been posted exclusively for the restoration work at the NMR.

The 38 km stretch line has been divided into three sections and restoration works were going on simultaneously in all the sections. In the first stretch, a 10 km section between Kallar and Bridge No.66, progress has been made for about four kms from Kallar. In this section, 172 cubic metres of mud and rock from the landslips have been removed from the track at nine locations. About 220 cubic metres of mud and rock have been removed from three locations on the second stretch between Bridge No.66 to Coonoor and in the third stretch of 15 km between Coonoor and Ooty, 1220 cubic metres of mud and rock have been removed from nine locations. The total earthwork that needs to be removed works out to nearly 30,000 cubic metres. So far, 21 locations have been cleared out of the total 111 locations identified.

-- (UNI) -- 18MS59.xml

 
  Viewer's Comment
Comments Not Available
 
 More Stories

Rajasthan Tourism beckons 

Anbazhagan blames Pondy govt for rising rate 

Haryana issues advisory on consumption of Lauki juice 

Encephalitis not any issue in Poorvanchal during UP polls ! 

Congress will do better than expected in UP polls: Digvijay 

Case of poll code violation against Cong candidate 

Lakhs join Friday following Eid-e-Milad prayers in Kashmir, Ladakh 

NBA demand to scrap Maheshwar deal 


Print this Page
Printer Friendly Version
SocialTwist Tell-a-Friend

Search Archives :  



Quick Links - Webindia123.com
Services
Health
Hobbies
Entertainment
Classifieds
Career / Education
UK, USA, Canada
Utilities
E-Booking
India Reference
 
 
 
 
 
Personalities
 
 
 
 
IndianStates
Punjab
 
Rajasthan
 
Sikkim
 
  
Tripura
 
 
 
 
Pondicherry

Copyright 2000-2012 Suni Systems (P) Ltd.
All rights reserved